|
The Cerro de Oro Dam ((英語:Gold Hill Dam)), also called the Miguel de la Madrid Hurtado Dam, is on the Santo Domingo River in the San Juan Bautista Tuxtepec municipality of the Papaloapan Region of Oaxaca state in southern Mexico. The dam operates in conjunction with the Miguel Alemán Dam, located on the Tonto River to control floods in the Papaloapan basin in Veracruz state. Construction began in 1973 and the dam was completed in May 1989. About 26,000 people were displaced by the project. Water quality in the reservoir is poor and deteriorating, affecting fish catches. ==Purpose== The Santo Domingo joins the Valle Nacional River river below the dam to form the Papaloapan river, which is joined by the Tonto river to the north of the city of San Juan Bautista Tuxtepec and meanders northeastward through the Veracruz coastal plain to the Gulf of Mexico. The Papaloapan river basin was subject to frequent flooding, with the damage sometimes compounded by cyclones. A particularly severe flood in September 1944 covered 470,000 hectares, with great loss of life and property. The Miguel Aleman dam reduced the problem, but further floods occurred after it had been completed in 1955. A flood in 1958 covered 195,000 hectares and one in 1969 covered 340,000 hectares. Meanwhile, the drainage capacity of the Papaloapan river was being reduced by silt carried by the Santo Domingo river. The Papaloapan river Commission recommended building the Cerro de Oro dam on the Santo Domingo river, which would reduce the extent of floods to a manageable level. The combined reservoir of the two dams would also support increased power generation from the Miguel Alemán dam. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Cerro de Oro Dam」の詳細全文を読む スポンサード リンク
|